Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

Vessel being prepared for demolition.

Demolition - Vessel Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Demolition - Vessel Safe Work Method Statement

This Demolition - Vessel Safe Work Method Statement (SWMS) covers hazards and controls associated with controlling the Demolitin Vessel.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile Plant Movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Night Work, Hot Work, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Demolition - Vessel SWMS:

(includes potential hazards and control measures)

  1. Working Outdoors
  2. Arrival On-Site & Assess Onsite Conditions
  3. Establish Safe Work Zone (Safe Set-Up)
  4. Environment
  5. Housekeeping
  6. Manual Tasks
  7. Delivery, Set-Up & Removal of the Excavator
  8. Establish a Communication System with Pedestrian Ground Workers
  9. Vessel Demolition
  10. Loading Trucks/Skips
  11. Trimming Steel Using Grinder or Cut-Off Saw
  12. Changing Attachments
  13. Operations with Hydraulic Attachments
  14. Fuelling the Plant
  15. On Completion
  16. Emergency Response

 

We've recently reviewed and updated this SWMS in line with the new Code of Practice for managing risks of plant in the workplace. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Demolition - Vessel Safe Work Method Statement

This Demolition - Vessel Safe Work Method Statement (SWMS) covers hazards and controls associated with controlling the Demolitin Vessel.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile Plant Movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Night Work, Hot Work, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Demolition - Vessel SWMS:

(includes potential hazards and control measures)

  1. Working Outdoors
  2. Arrival On-Site & Assess Onsite Conditions
  3. Establish Safe Work Zone (Safe Set-Up)
  4. Environment
  5. Housekeeping
  6. Manual Tasks
  7. Delivery, Set-Up & Removal of the Excavator
  8. Establish a Communication System with Pedestrian Ground Workers
  9. Vessel Demolition
  10. Loading Trucks/Skips
  11. Trimming Steel Using Grinder or Cut-Off Saw
  12. Changing Attachments
  13. Operations with Hydraulic Attachments
  14. Fuelling the Plant
  15. On Completion
  16. Emergency Response

 

We've recently reviewed and updated this SWMS in line with the new Code of Practice for managing risks of plant in the workplace. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.

PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View