Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

Mobile plant Hire Yard well organised.

Hire Yard Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Hire Yard Safe Work Method Statement

This Hire Yard Safe Work Method Statement (SWMS) covers the movement and loading/unloading of equipment at the hire yard only. It does not cover work on other sites.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Noise and Vibration, Slips, Trips & Falls, Hazardous Substances, Fuels, Oils & Chemicals, Hazardous Manual Tasks & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Hire Yard SWMS: 

(includes potential hazards & control measures).

  1. Training
  2. Working Outdoors
  3. Housekeeping
  4. Environment
  5. Relocating, Loading or Unloading Powered Mobile Plant
  6. Loading & Unloading Non-Mobile Equipment
  7. Isolation - Lockout / Tag Out (LOTO)
  8. Plant and Equipment Maintenance
  9. Fuelling
  10. On Completion
  11. Emergency Response

 

We've recently reviewed and updated this SWMS in line with the new Code of Practice for managing risks of plant in the workplace. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Hire Yard Safe Work Method Statement

This Hire Yard Safe Work Method Statement (SWMS) covers the movement and loading/unloading of equipment at the hire yard only. It does not cover work on other sites.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Noise and Vibration, Slips, Trips & Falls, Hazardous Substances, Fuels, Oils & Chemicals, Hazardous Manual Tasks & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Hire Yard SWMS: 

(includes potential hazards & control measures).

  1. Training
  2. Working Outdoors
  3. Housekeeping
  4. Environment
  5. Relocating, Loading or Unloading Powered Mobile Plant
  6. Loading & Unloading Non-Mobile Equipment
  7. Isolation - Lockout / Tag Out (LOTO)
  8. Plant and Equipment Maintenance
  9. Fuelling
  10. On Completion
  11. Emergency Response

 

We've recently reviewed and updated this SWMS in line with the new Code of Practice for managing risks of plant in the workplace. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.

PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View