Pole Saw SWMS 10617-1

Product SKU: 10617

Pole Saw SWMS | Safe Work Method Statement
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Pole Saw SWMS | Safe Work Method Statement

This Pole Saw Safe Work Method Statement (SWMS) outlines the safety steps, general hazards and controls associated with the use of a petrol driven Pole Saw.

This SWMS includes preparation and planning, training requirements, contact with electricity, setting up a work area, pole saw operation and re-fuelling procedures.  

Job Steps Covered in Pole Saw SWMS:

(includes potential hazards & control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Transporting the Pole Saw
  4. Assess On-site Conditions
  5. Work Area Set-up
  6. Pole Saw Operation
  7. Re-fuelling On-site
  8. On Completion

Pole Saw Safe Work Method Statement Includes

Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

 

Instant Document Delivery via Email

FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

 

Ready to Use

Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

Simply add your company details and read the document to ensure all details are relevant to your business.

Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

Go Digital - Microsoft Word

Edit your SWMS on the go with the Microsoft Office Mobile App

 

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write a Review
$79.95 (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Pole Saw SWMS | Safe Work Method Statement

    This Pole Saw Safe Work Method Statement (SWMS) outlines the safety steps, general hazards and controls associated with the use of a petrol driven Pole Saw.

    This SWMS includes preparation and planning, training requirements, contact with electricity, setting up a work area, pole saw operation and re-fuelling procedures.  

    Job Steps Covered in Pole Saw SWMS:

    (includes potential hazards & control measures)

    1. Planning & Preparation
    2. Training & Capabilities
    3. Transporting the Pole Saw
    4. Assess On-site Conditions
    5. Work Area Set-up
    6. Pole Saw Operation
    7. Re-fuelling On-site
    8. On Completion

    Pole Saw Safe Work Method Statement Includes

    Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

     

    Instant Document Delivery via Email

    FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

     

    Ready to Use

    Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

    Simply add your company details and read the document to ensure all details are relevant to your business.

    Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

    Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

    Go Digital - Microsoft Word

    Edit your SWMS on the go with the Microsoft Office Mobile App

     

    We're here to help if you need us!

    Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

    SWMS Frequently Asked Questions | Helpful Video Tutorials

  • Document Sample
  • PDF Download
    PDF File
  • Tutorials

You may also need