Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

Coffee Machine

Coffee Machine Installation-Repair Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Coffee Machine Installation-Repair Safe Work Method Statement

This Coffee Machine Installation-Repair Safe Work Method Statement (SWMS) covers hazards and controls associated with the installation and repair of coffee machines.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Coffee Machine Installation-Repair SWMS: 

(includes potential hazards & control measures).

  1. Arrival On-site & Assess On-site Conditions
  2. Work Area Set-up
  3. Powered Mobile Plant Movement
  4. Environment
  5. Housekeeping
  6. Manual Tasks
  7. Working with Powered & Non-powered Tools
  8. Hazardous Substance/Chemical Use
  9. Coffee Machine Installation
  10. Handover & Training to End-user
  11. Maintenance & Repair
  12. On Completion
  13. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Coffee Machine Installation-Repair Safe Work Method Statement

This Coffee Machine Installation-Repair Safe Work Method Statement (SWMS) covers hazards and controls associated with the installation and repair of coffee machines.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Coffee Machine Installation-Repair SWMS: 

(includes potential hazards & control measures).

  1. Arrival On-site & Assess On-site Conditions
  2. Work Area Set-up
  3. Powered Mobile Plant Movement
  4. Environment
  5. Housekeeping
  6. Manual Tasks
  7. Working with Powered & Non-powered Tools
  8. Hazardous Substance/Chemical Use
  9. Coffee Machine Installation
  10. Handover & Training to End-user
  11. Maintenance & Repair
  12. On Completion
  13. Emergency Response
PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View