Concrete Formwork (Decks/Columns/Stairs) SWMS 10516-5

Product SKU: 10516

Concrete Formwork (Decks/Columns/Stairs) SWMS | Safe Work Method Statement
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Concrete Formwork (Decks/Columns/Stairs) SWMS | Safe Work Method Statement 

This Concrete Formwork (Decks/Columns/Stairs) Safe Work Method Statement (SWMS) covers hazards and controls associated with carrying out work that involves formwork for walls, columns and stairs.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Structures or buildings involving structural alterations or repairs that require temporary support to prevent collapse
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Job Steps Covered in Concrete Formwork (Decks/Columns/Stairs) SWMS: 

(includes potential hazards and control measures)

  1. Formwork Design
  2. Arrival On-site & Assess On-site Conditions
  3. Working Outdoors
  4. Work Area Set-up
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Materials Delivery
  9. Working with Powered & Non-powered Tools
  10. Working at Height on Ladders, Trestles, Mobile Scaffold & Openings
  11. False Decks
  12. Erecting Frames including Base Plates & U Heads
  13. Installing Bearers & Joists
  14. Laying Form-ply hSeets on Decks & Landings
  15. Constructing Wall & Column Forms
  16. Applying Bond Breakers (if applicable) & Working with Concrete
  17. Standing Form Sections using a Crane
  18. Applying Bond Breakers (if applicable)
  19. Concrete Pour
  20. Stripping Formwork (planning)
  21. Stripping Formwork
  22. On Completion
  23. Emergency Response

Concrete Formwork (Decks/Columns/Stairs) SWMS Includes

Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

 

Instant Document Delivery via Email

FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

Ready to Use Concrete Formwork (Decks/Columns/Stairs) Safe Work Method Statement

Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

Simply add your company details and read the document to ensure all details are relevant to your business.

Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

Concrete Formwork (Decks/Columns/Stairs) Safe Work Method Statements (SWMS) - Microsoft Word Format

Edit your SWMS on the go with the Microsoft Office Mobile App

 

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write a Review
$79.95   (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Concrete Formwork (Decks/Columns/Stairs) SWMS | Safe Work Method Statement 

    This Concrete Formwork (Decks/Columns/Stairs) Safe Work Method Statement (SWMS) covers hazards and controls associated with carrying out work that involves formwork for walls, columns and stairs.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Structures or buildings involving structural alterations or repairs that require temporary support to prevent collapse
    • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

    Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

    Job Steps Covered in Concrete Formwork (Decks/Columns/Stairs) SWMS: 

    (includes potential hazards and control measures)

    1. Formwork Design
    2. Arrival On-site & Assess On-site Conditions
    3. Working Outdoors
    4. Work Area Set-up
    5. Environment
    6. Housekeeping
    7. Manual Tasks
    8. Materials Delivery
    9. Working with Powered & Non-powered Tools
    10. Working at Height on Ladders, Trestles, Mobile Scaffold & Openings
    11. False Decks
    12. Erecting Frames including Base Plates & U Heads
    13. Installing Bearers & Joists
    14. Laying Form-ply hSeets on Decks & Landings
    15. Constructing Wall & Column Forms
    16. Applying Bond Breakers (if applicable) & Working with Concrete
    17. Standing Form Sections using a Crane
    18. Applying Bond Breakers (if applicable)
    19. Concrete Pour
    20. Stripping Formwork (planning)
    21. Stripping Formwork
    22. On Completion
    23. Emergency Response

    Concrete Formwork (Decks/Columns/Stairs) SWMS Includes

    Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

     

    Instant Document Delivery via Email

    FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

    Ready to Use Concrete Formwork (Decks/Columns/Stairs) Safe Work Method Statement

    Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

    Simply add your company details and read the document to ensure all details are relevant to your business.

    Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

    Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

    Concrete Formwork (Decks/Columns/Stairs) Safe Work Method Statements (SWMS) - Microsoft Word Format

    Edit your SWMS on the go with the Microsoft Office Mobile App

     

    We're here to help if you need us!

    Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

    SWMS Frequently Asked Questions | Helpful Video Tutorials

  • Document Sample
  • PDF Download
    PDF File
  • Tutorials