Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

Concrete work site with concrete piling set-up in place.

Concrete Piling Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Concrete Piling Safe Work Method Statement

This Concrete Piling Safe Work Method Statement (SWMS) covers hazards and controls associated with the general safety of work when conducting drilling and concrete piling operations with the use of an excavator.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Concrete Piling SWMS:

(includes potential hazards and control measures)

  1. Planning
  2. Arrival On-site & Assess On-site Conditions
  3. Working Outdoors
  4. Work Area Set-up
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Delivery & Removal of Plant
  9. Materials Delivery
  10. Hazardous Substance/Chemical Use
  11. Connecting Attachments (augers)
  12. Machine Operation (drilling, piling)
  13. Steel Reinforcement
  14. Concrete Pour
  15. Setting Starter Bars/Column Bolts
  16. On Completion
  17. Emergency Response

 

We've recently reviewed and updated this SWMS in line with the new Code of Practice for managing risks of plant in the workplace. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Concrete Piling Safe Work Method Statement

This Concrete Piling Safe Work Method Statement (SWMS) covers hazards and controls associated with the general safety of work when conducting drilling and concrete piling operations with the use of an excavator.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Concrete Piling SWMS:

(includes potential hazards and control measures)

  1. Planning
  2. Arrival On-site & Assess On-site Conditions
  3. Working Outdoors
  4. Work Area Set-up
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Delivery & Removal of Plant
  9. Materials Delivery
  10. Hazardous Substance/Chemical Use
  11. Connecting Attachments (augers)
  12. Machine Operation (drilling, piling)
  13. Steel Reinforcement
  14. Concrete Pour
  15. Setting Starter Bars/Column Bolts
  16. On Completion
  17. Emergency Response

 

We've recently reviewed and updated this SWMS in line with the new Code of Practice for managing risks of plant in the workplace. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.

PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View