Concrete Slab (Waffle Pod Raft System) SWMS 10309-7

Product SKU: 10309

Concrete Slab (Waffle Pod Raft System) SWMS | Safe Work Method Statement
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Concrete Slab (Waffle Pod Raft System) SWMS | Safe Work Method Statement

This Concrete Slab (Waffle Pod Raft System) Safe Work Method Statement (SWMS) covers hazards and controls, associated with handling, delivery and placement of wet concrete being placed into a waffle pod raft system. 

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Job Steps Covered in Concrete Slab (Waffle Pod Raft System) SWMS:

(includes potential hazards and control measures)

  1. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
  2. Working Outdoors
  3. Arrival On-site & Assess On-site Conditions
  4. Work Area Set-up
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Delivering Materials, Subgrade Preparation, Concrete Delivery
  9. Working with Powered & Non-powered Tools
  10. Setting-out/Profiling Building Lines
  11. Subgrade Preparation
  12. Waffle Pod Placement
  13. Setting Steel & Formwork
  14. Placing Concrete & Finish
  15. Fuelling Small Engines On-site
  16. On Completion
  17. Emergency Response

Concrete Slab (Waffle Pod Raft System) SWMS Includes

Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

 

Instant Document Delivery via Email

FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

Ready to Use Concrete Slab (Waffle Pod Raft System) Safe Work Method Statement

Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

Simply add your company details and read the document to ensure all details are relevant to your business.

Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

Concrete Slab (Waffle Pod Raft System) Safe Work Method Statements (SWMS) - Microsoft Word Format

Edit your SWMS on the go with the Microsoft Office Mobile App

 

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write a Review
$79.95   (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Concrete Slab (Waffle Pod Raft System) SWMS | Safe Work Method Statement

    This Concrete Slab (Waffle Pod Raft System) Safe Work Method Statement (SWMS) covers hazards and controls, associated with handling, delivery and placement of wet concrete being placed into a waffle pod raft system. 

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Work in an area that may have a contaminated or flammable atmosphere

    Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

    Job Steps Covered in Concrete Slab (Waffle Pod Raft System) SWMS:

    (includes potential hazards and control measures)

    1. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
    2. Working Outdoors
    3. Arrival On-site & Assess On-site Conditions
    4. Work Area Set-up
    5. Environment
    6. Housekeeping
    7. Manual Tasks
    8. Delivering Materials, Subgrade Preparation, Concrete Delivery
    9. Working with Powered & Non-powered Tools
    10. Setting-out/Profiling Building Lines
    11. Subgrade Preparation
    12. Waffle Pod Placement
    13. Setting Steel & Formwork
    14. Placing Concrete & Finish
    15. Fuelling Small Engines On-site
    16. On Completion
    17. Emergency Response

    Concrete Slab (Waffle Pod Raft System) SWMS Includes

    Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

     

    Instant Document Delivery via Email

    FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

    Ready to Use Concrete Slab (Waffle Pod Raft System) Safe Work Method Statement

    Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

    Simply add your company details and read the document to ensure all details are relevant to your business.

    Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

    Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

    Concrete Slab (Waffle Pod Raft System) Safe Work Method Statements (SWMS) - Microsoft Word Format

    Edit your SWMS on the go with the Microsoft Office Mobile App

     

    We're here to help if you need us!

    Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

    SWMS Frequently Asked Questions | Helpful Video Tutorials

  • Document Sample
  • PDF Download
    PDF File
  • Tutorials