Concrete Underpinning SWMS 10330-2

Product SKU: 10330

Concrete Underpinning SWMS | Safe Work Method Statement
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Concrete Underpinning SWMS | Safe Work Method Statement

This Concrete Underpinning Safe Work Method Statement (SWMS) outlines the safety steps, main hazards, risks and controls associated with concrete underpinning structures.

This SWMS includes working adjacent to mobile plant equipment, shoring and trench shields, hazardous atmospheres and contaminated ground, contact with overhead electrical services falls and general safety items such as PPE and hazardous manual handling procedures.

Job Steps Covered in Concrete Underpinning SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Implement a Site-specific Emergency Response Plan (Provided in this SWMS)
  3. Arrival at Site
  4. Set-up Work Area
  5. Establish Temporary Traffic Control (TMP)
  6. Delivery of Materials/Equipment 
  7. Excavating & Backfilling
  8. Installing & Removing Trench Shields/Shoring or Other Materials
  9. Excavating Trench/Water Charged Ground
  10. Buried Contaminants
  11. Working in Trenches > 1.5m Deep
  12. Concrete Foundation Placement
  13. On Completion

Concrete Underpinning Safe Work Method Statement Includes

Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

 

Instant Document Delivery via Email

FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

 

For work carried out on a regular basis a generic Safe Work Method Statement (SWMS) may be prepared and used for those work activities.

Remember: The content of a Safe Work Method Statement (SWMS) should be refined over time and include consultation with workers and other persons conducting a business or undertaking.

Prior to each new activity, each Safe Work Method Statement (SWMS) must be reviewed and revised to ensure they apply to the current work activities and the actual site you are working at.

Go Digital - Microsoft Word

Edit your SWMS on the go with the Microsoft Office Mobile App

 

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write a Review
$79.95 (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Concrete Underpinning SWMS | Safe Work Method Statement

    This Concrete Underpinning Safe Work Method Statement (SWMS) outlines the safety steps, main hazards, risks and controls associated with concrete underpinning structures.

    This SWMS includes working adjacent to mobile plant equipment, shoring and trench shields, hazardous atmospheres and contaminated ground, contact with overhead electrical services falls and general safety items such as PPE and hazardous manual handling procedures.

    Job Steps Covered in Concrete Underpinning SWMS:

    (includes potential hazards and control measures)

    1. Planning & Preparation
    2. Implement a Site-specific Emergency Response Plan (Provided in this SWMS)
    3. Arrival at Site
    4. Set-up Work Area
    5. Establish Temporary Traffic Control (TMP)
    6. Delivery of Materials/Equipment 
    7. Excavating & Backfilling
    8. Installing & Removing Trench Shields/Shoring or Other Materials
    9. Excavating Trench/Water Charged Ground
    10. Buried Contaminants
    11. Working in Trenches > 1.5m Deep
    12. Concrete Foundation Placement
    13. On Completion

    Concrete Underpinning Safe Work Method Statement Includes

    Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

     

    Instant Document Delivery via Email

    FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

     

    For work carried out on a regular basis a generic Safe Work Method Statement (SWMS) may be prepared and used for those work activities.

    Remember: The content of a Safe Work Method Statement (SWMS) should be refined over time and include consultation with workers and other persons conducting a business or undertaking.

    Prior to each new activity, each Safe Work Method Statement (SWMS) must be reviewed and revised to ensure they apply to the current work activities and the actual site you are working at.

    Go Digital - Microsoft Word

    Edit your SWMS on the go with the Microsoft Office Mobile App

     

    We're here to help if you need us!

    Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

    SWMS Frequently Asked Questions | Helpful Video Tutorials

  • Document Sample
  • PDF Download
    PDF File
  • Tutorials