Crane Operation (Truck Mounted) SWMS 10133-5

Product SKU: 10133

Crane Operation (Truck Mounted) SWMS | Safe Work Method Statement
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Crane Operation (Truck Mounted) SWMS | Safe Work Method Statement

This Crane Operation (Truck Mounted) Safe Work Method Statement (SWMS) covers hazards and controls associated with the use of a truck-mounted crane such as a Hiab.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.

Bonus Crane Truck Pre-start Checklist included with this SWMS.

Job Steps Covered in Crane Operation (Truck Mounted) SWMS:

(includes potential hazards and control measures)

  1. Training
  2. Road Operation
  3. Arrival On-site & Assess On-site Conditions
  4. Work Area Set-up
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Establish a Communication System
  9. Pre-inspect Crane
  10. Select & Inspect Load Equipment
  11. Pre-lift Assessment
  12. Loading & Unloading
  13. Changing Lift Attachments
  14. Refuelling On-site
  15. On Completion
  16. Emergency Response

Crane Operation (Truck Mounted) SWMS Includes

Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

 

Instant Document Delivery via Email

FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

Ready to Use Crane Operation (Truck Mounted) Safe Work Method Statement

Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

Simply add your company details and read the document to ensure all details are relevant to your business.

Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

Crane Operation (Truck Mounted) Safe Work Method Statements (SWMS) - Microsoft Word Format

Edit your SWMS on the go with the Microsoft Office Mobile App

 

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

2 reviews Write a Review
$79.95   (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Crane Operation (Truck Mounted) SWMS | Safe Work Method Statement

    This Crane Operation (Truck Mounted) Safe Work Method Statement (SWMS) covers hazards and controls associated with the use of a truck-mounted crane such as a Hiab.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Work in an area that may have a contaminated or flammable atmosphere

    Additional controls are included for Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.

    Bonus Crane Truck Pre-start Checklist included with this SWMS.

    Job Steps Covered in Crane Operation (Truck Mounted) SWMS:

    (includes potential hazards and control measures)

    1. Training
    2. Road Operation
    3. Arrival On-site & Assess On-site Conditions
    4. Work Area Set-up
    5. Environment
    6. Housekeeping
    7. Manual Tasks
    8. Establish a Communication System
    9. Pre-inspect Crane
    10. Select & Inspect Load Equipment
    11. Pre-lift Assessment
    12. Loading & Unloading
    13. Changing Lift Attachments
    14. Refuelling On-site
    15. On Completion
    16. Emergency Response

    Crane Operation (Truck Mounted) SWMS Includes

    Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

     

    Instant Document Delivery via Email

    FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

    Ready to Use Crane Operation (Truck Mounted) Safe Work Method Statement

    Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

    Simply add your company details and read the document to ensure all details are relevant to your business.

    Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

    Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

    Crane Operation (Truck Mounted) Safe Work Method Statements (SWMS) - Microsoft Word Format

    Edit your SWMS on the go with the Microsoft Office Mobile App

     

    We're here to help if you need us!

    Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

    SWMS Frequently Asked Questions | Helpful Video Tutorials

  • Document Sample
  • PDF Download
    PDF File
  • Tutorials
  • Reviews
  • 2 Reviews

    • 5

      Truck Mounted Crane

      Posted by O R Transport Pty Ltd on Aug 25th 2017

      Very happy with the customer service I received. The document met all our needs.

    • 4

      Truck Mounted Crane

      Posted by Steve Green on Nov 22nd 2016

      Very happy with customer service received and more importantly the document ticked all the boxes required to be worksafe compliant