Demolition (Soft) SWMS 10367-9

Product SKU: 10367

Demolition (Soft) SWMS | Safe Work Method Statement
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Demolition (Soft) SWMS | Safe Work Method Statement

This Demolition (Soft) Safe Work Method Statement (SWMS) covers hazards and controls associated with the strip-out of existing premises in preparation for demolishing a structure or refurbishment.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Structures or buildings involving structural alterations or repairs that require temporary support to prevent collapse
  • Working at depths greater than 1.5 Metres, including tunnels or mines

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hot Work, Hazardous Manual Tasks, Silica Dust & Environmental Considerations.

Job Steps Covered in Demolition (Soft) SWMS:

(includes potential hazards and control measures)

  1. Planning
  2. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
  3. Working Outdoors
  4. Arrival On-site & Assess On-site Conditions
  5. Work Area Set-up
  6. Allocate a Suitable Area for Materials Management Site
  7. Environment
  8. Housekeeping
  9. Manual Tasks
  10. Working with Powered & Non-powered Tools
  11. Hazardous Substance/Chemical Use
  12. Working at Height on Ladders, Trestles, Mobile Scaffold & Openings
  13. Remove Non-fixed Items (i.e. furnishings, cabinets, rugs, appliances, motors, mobile partitions etc.)
  14. Glazing/Mirror Removal
  15. Carpet, Vinyl, Timber Floor Covering Removal
  16. Tile, Concrete Flooring Removal
  17. Removal Ceiling Fittings, Ceiling, Wall Lining, Redundant Cabling
  18. Removing Structural Walls or Supporting Framework
  19. On Completion
  20. Emergency Response

Demolition (Soft) SWMS Includes

Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

 

Instant Document Delivery via Email

FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

Ready to Use Demolition (Soft) Safe Work Method Statement

Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

Simply add your company details and read the document to ensure all details are relevant to your business.

Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

Demolition (Soft) Safe Work Method Statements (SWMS) - Microsoft Word Format

Edit your SWMS on the go with the Microsoft Office Mobile App

 

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write a Review
$79.95   (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Demolition (Soft) SWMS | Safe Work Method Statement

    This Demolition (Soft) Safe Work Method Statement (SWMS) covers hazards and controls associated with the strip-out of existing premises in preparation for demolishing a structure or refurbishment.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Structures or buildings involving structural alterations or repairs that require temporary support to prevent collapse
    • Working at depths greater than 1.5 Metres, including tunnels or mines

    Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hot Work, Hazardous Manual Tasks, Silica Dust & Environmental Considerations.

    Job Steps Covered in Demolition (Soft) SWMS:

    (includes potential hazards and control measures)

    1. Planning
    2. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
    3. Working Outdoors
    4. Arrival On-site & Assess On-site Conditions
    5. Work Area Set-up
    6. Allocate a Suitable Area for Materials Management Site
    7. Environment
    8. Housekeeping
    9. Manual Tasks
    10. Working with Powered & Non-powered Tools
    11. Hazardous Substance/Chemical Use
    12. Working at Height on Ladders, Trestles, Mobile Scaffold & Openings
    13. Remove Non-fixed Items (i.e. furnishings, cabinets, rugs, appliances, motors, mobile partitions etc.)
    14. Glazing/Mirror Removal
    15. Carpet, Vinyl, Timber Floor Covering Removal
    16. Tile, Concrete Flooring Removal
    17. Removal Ceiling Fittings, Ceiling, Wall Lining, Redundant Cabling
    18. Removing Structural Walls or Supporting Framework
    19. On Completion
    20. Emergency Response

    Demolition (Soft) SWMS Includes

    Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

     

    Instant Document Delivery via Email

    FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

    Ready to Use Demolition (Soft) Safe Work Method Statement

    Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

    Simply add your company details and read the document to ensure all details are relevant to your business.

    Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

    Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

    Demolition (Soft) Safe Work Method Statements (SWMS) - Microsoft Word Format

    Edit your SWMS on the go with the Microsoft Office Mobile App

     

    We're here to help if you need us!

    Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

    SWMS Frequently Asked Questions | Helpful Video Tutorials

  • Document Sample
  • PDF Download
    PDF File
  • Tutorials

You may also need