Demolition SWMS 10078-8

Product SKU: 10078

Demolition SWMS | Safe Work Method Statement
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Demolition SWMS | Safe Work Method Statement

This Demolition Safe Work Method Statement (SWMS) covers hazards and controls in regards to manually and mechanically demolishing structures and plant.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Asbestos disturbance
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Structures or buildings involving structural alterations or repairs that require temporary support to prevent collapse
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hot Work, Hazardous Manual Tasks, Silica Dust & Environmental Considerations.

Job Steps Covered in Demolition SWMS:

(includes potential hazards and control measures)

  1. Planning
  2. Establish a Demolition Work Plan (DWP)
  3. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
  4. De-commission & Disconnect Services
  5. Establish On-site Systems
  6. Environment
  7. Demolition – Mechanical &/or Manual
  8. Monitor & Inspect
  9. Emergency Response

For more detailed control measures you may want to purchase SWMS such as:

Demolition Safe Work Method Statement Includes

Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

 

Instant Document Delivery via Email

FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

 

Ready to Use

Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

Simply add your company details and read the document to ensure all details are relevant to your business.

Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

Go Digital - Microsoft Word

Edit your SWMS on the go with the Microsoft Office Mobile App

 

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write a Review
$79.95 (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Demolition SWMS | Safe Work Method Statement

    This Demolition Safe Work Method Statement (SWMS) covers hazards and controls in regards to manually and mechanically demolishing structures and plant.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Asbestos disturbance
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Structures or buildings involving structural alterations or repairs that require temporary support to prevent collapse
    • Work in an area that may have a contaminated or flammable atmosphere

    Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hot Work, Hazardous Manual Tasks, Silica Dust & Environmental Considerations.

    Job Steps Covered in Demolition SWMS:

    (includes potential hazards and control measures)

    1. Planning
    2. Establish a Demolition Work Plan (DWP)
    3. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
    4. De-commission & Disconnect Services
    5. Establish On-site Systems
    6. Environment
    7. Demolition – Mechanical &/or Manual
    8. Monitor & Inspect
    9. Emergency Response

    For more detailed control measures you may want to purchase SWMS such as:

    Demolition Safe Work Method Statement Includes

    Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

     

    Instant Document Delivery via Email

    FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

     

    Ready to Use

    Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

    Simply add your company details and read the document to ensure all details are relevant to your business.

    Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

    Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

    Go Digital - Microsoft Word

    Edit your SWMS on the go with the Microsoft Office Mobile App

     

    We're here to help if you need us!

    Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

    SWMS Frequently Asked Questions | Helpful Video Tutorials

  • Document Sample
  • PDF Download
    PDF File
  • Tutorials