Electrical (Cable Ladder, Tray & Conduit Installation) SWMS 10477-2

Product SKU: 10477

Electrical (Cable Ladder, Tray & Conduit Installation) SWMS | Safe Work Method Statement
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Electrical (Cable Ladder, Tray & Conduit Installation) SWMS | Safe Work Method Statement

This Electrical (Cable Ladder, Tray & Conduit Installation) Safe Work Method Statement (SWMS) covers hazards and controls when installing cable ladders, trays and conduits.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hot Work, Hazardous Manual Tasks, Silica Dust & Environmental Considerations.

Job Steps Covered in Electrical (Cable Ladder, Tray & Conduit Installation) SWMS:

(includes potential hazards and control measures)

  1. Arrival On-site, Site Assessment & Unloading of Materials/Equipment
  2. Work Area Set-up
  3. Locate & Isolate Existing Services
  4. Environment
  5. Housekeeping
  6. Manual Tasks
  7. Working with Powered & Non-powered Tools
  8. Hazardous Substance/Chemical Use
  9. Working at Height on Ladders, Trestles & Mobile Scaffold
  10. Securing Fixings, Supports, Fitting Trays, Ladders & Conduit
  11. On Completion
  12. Emergency Response

Electrical (Cable Ladder, Tray & Conduit Installation) SWMS Includes

Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

 

Instant Document Delivery via Email

FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

Ready to Use Insulation Safe Work Method Statement

Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

Simply add your company details and read the document to ensure all details are relevant to your business.

Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

Insulation Safe Work Method Statements (SWMS) - Microsoft Word Format

Edit your SWMS on the go with the Microsoft Office Mobile App

 

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write a Review
$79.95   (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Electrical (Cable Ladder, Tray & Conduit Installation) SWMS | Safe Work Method Statement

    This Electrical (Cable Ladder, Tray & Conduit Installation) Safe Work Method Statement (SWMS) covers hazards and controls when installing cable ladders, trays and conduits.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Work in an area that may have a contaminated or flammable atmosphere

    Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hot Work, Hazardous Manual Tasks, Silica Dust & Environmental Considerations.

    Job Steps Covered in Electrical (Cable Ladder, Tray & Conduit Installation) SWMS:

    (includes potential hazards and control measures)

    1. Arrival On-site, Site Assessment & Unloading of Materials/Equipment
    2. Work Area Set-up
    3. Locate & Isolate Existing Services
    4. Environment
    5. Housekeeping
    6. Manual Tasks
    7. Working with Powered & Non-powered Tools
    8. Hazardous Substance/Chemical Use
    9. Working at Height on Ladders, Trestles & Mobile Scaffold
    10. Securing Fixings, Supports, Fitting Trays, Ladders & Conduit
    11. On Completion
    12. Emergency Response

    Electrical (Cable Ladder, Tray & Conduit Installation) SWMS Includes

    Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

     

    Instant Document Delivery via Email

    FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

    Ready to Use Insulation Safe Work Method Statement

    Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

    Simply add your company details and read the document to ensure all details are relevant to your business.

    Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

    Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

    Insulation Safe Work Method Statements (SWMS) - Microsoft Word Format

    Edit your SWMS on the go with the Microsoft Office Mobile App

     

    We're here to help if you need us!

    Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

    SWMS Frequently Asked Questions | Helpful Video Tutorials

  • Document Sample
  • PDF Download
    PDF File
  • Tutorials

You may also need