Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

Pipework on back of excavation truck

Truck Mounted Hydro Excavation Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Truck Mounted Hydro Excavation Safe Work Method Statement

This Truck Mounted Hydro Excavation Safe Work Method Statement (SWMS) covers hazards and controls associated with the general operation for truck mounted hydro excavation.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Asbestos disturbance
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Truck Mounted Hydro Excavation SWMS:

(includes potential hazards and control measures)

  1. Planning
  2. Road Operation
  3. Environment
  4. Working Outdoors
  5. Housekeeping
  6. Manual Tasks
  7. Working with Powered & Non-powered Tools
  8. Hazardous Substance/Chemical Use
  9. Obtaining Water from a Hydrant or another Water Source (e.g. creek/dam)
  10. Arrival On-site & Assess On-site Conditions
  11. Manhole/Pit Safety
  12. Pumps
  13. Hydro Jetting
  14. Vacuum Operation
  15. Unloading/Emptying Tank
  16. Backfilling Excavation Manually
  17. Re-fuelling
  18. On Completion
  19. Emergency Response

 

We've recently reviewed and updated this SWMS in line with the new Code of Practice for managing risks of plant in the workplace. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Truck Mounted Hydro Excavation Safe Work Method Statement

This Truck Mounted Hydro Excavation Safe Work Method Statement (SWMS) covers hazards and controls associated with the general operation for truck mounted hydro excavation.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Asbestos disturbance
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Truck Mounted Hydro Excavation SWMS:

(includes potential hazards and control measures)

  1. Planning
  2. Road Operation
  3. Environment
  4. Working Outdoors
  5. Housekeeping
  6. Manual Tasks
  7. Working with Powered & Non-powered Tools
  8. Hazardous Substance/Chemical Use
  9. Obtaining Water from a Hydrant or another Water Source (e.g. creek/dam)
  10. Arrival On-site & Assess On-site Conditions
  11. Manhole/Pit Safety
  12. Pumps
  13. Hydro Jetting
  14. Vacuum Operation
  15. Unloading/Emptying Tank
  16. Backfilling Excavation Manually
  17. Re-fuelling
  18. On Completion
  19. Emergency Response

 

We've recently reviewed and updated this SWMS in line with the new Code of Practice for managing risks of plant in the workplace. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.

PDF Download
PDF File

Hear From Our Customers

  • 5

    Thorough, correct, east-to-use, great legislative reference attachments and easy to re-badge.

    Thorough, correct, east-to-use, great legislative reference attachments and easy to re-badge.

  • 5

    Good SWMS

    This SWMS is easy to follow and has changed the operation of this unit to a very good level of compliance.

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View