Heights (Erecting Fixed Scaffold) SWMS 10530-4

Product SKU: 10530

Heights (Erecting Fixed Scaffold) SWMS | Safe Work Method Statement
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Heights (Erecting Fixed Scaffold) SWMS | Safe Work Method Statement

This Heights (Erecting Fixed Scaffold) Safe Work Method Statement (SWMS) covers hazards and controls associated with the erection, dismantling and use of fixed scaffold.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Job Steps Covered in Heights (Erecting Fixed Scaffold) SWMS:

(includes potential hazards & control measures)

  1. Arrival On-site & Assess On-site Conditions
  2. Unloading Scaffolding
  3. Environment
  4. Working Outdoors
  5. Housekeeping
  6. Manual Tasks
  7. Working with Powered & Non-powered Tools
  8. Work Area Set-up & Pre-inspection
  9. Erecting Scaffold
  10. Working on Scaffolding
  11. Handover
  12. Dismantling
  13. On Completion
  14. Emergency Response

Heights (Erecting Fixed Scaffold) Safe Work Method Statement Includes

Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

 

Instant Document Delivery via Email

FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

 

Ready to Use

Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

Simply add your company details and read the document to ensure all details are relevant to your business.

Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

Go Digital - Microsoft Word

Edit your SWMS on the go with the Microsoft Office Mobile App

 

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write a Review
$79.95 (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Heights (Erecting Fixed Scaffold) SWMS | Safe Work Method Statement

    This Heights (Erecting Fixed Scaffold) Safe Work Method Statement (SWMS) covers hazards and controls associated with the erection, dismantling and use of fixed scaffold.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

    Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

    Job Steps Covered in Heights (Erecting Fixed Scaffold) SWMS:

    (includes potential hazards & control measures)

    1. Arrival On-site & Assess On-site Conditions
    2. Unloading Scaffolding
    3. Environment
    4. Working Outdoors
    5. Housekeeping
    6. Manual Tasks
    7. Working with Powered & Non-powered Tools
    8. Work Area Set-up & Pre-inspection
    9. Erecting Scaffold
    10. Working on Scaffolding
    11. Handover
    12. Dismantling
    13. On Completion
    14. Emergency Response

    Heights (Erecting Fixed Scaffold) Safe Work Method Statement Includes

    Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

     

    Instant Document Delivery via Email

    FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

     

    Ready to Use

    Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

    Simply add your company details and read the document to ensure all details are relevant to your business.

    Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

    Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

    Go Digital - Microsoft Word

    Edit your SWMS on the go with the Microsoft Office Mobile App

     

    We're here to help if you need us!

    Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

    SWMS Frequently Asked Questions | Helpful Video Tutorials

  • Document Sample
  • PDF Download
    PDF File
  • Tutorials