Heights (Erecting Swing Stage) SWMS 10538-2

Product SKU: 10538

Heights (Erecting Swing Stage) SWMS | Safe Work Method Statement
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Heights (Erecting Swing Stage) SWMS | Safe Work Method Statement

This Heights (Erecting Swing Stage) Safe Work Method Statement (SWMS) outlines the general safety steps, general hazards and controls associated with the installation of swing stage scaffold systems. 

This SWMS includes a Falls Emergency Rescue Plan.

Job Steps Covered in Heights (Erecting Swing Stage) SWMS:

(includes potential hazards & control measures)

  1. Planning & Preparation
  2. Suspended Scaffold Design
  3. Training & Capabilities
  4. Implement a Falls Emergency Rescue Plan
  5. Arrival On-site
  6. Materials Delivery
  7. Work Area Set-up
  8. Pre Operational Inspection
  9. Set-up Support/Anchor or Equipment
  10. Electrical Installation (Hoist Operation)
  11. Set-up/Operating Suspended Components
  12. Dismantling Suspended Scaffold
  13. Using Power Tools
  14. On Completion

Heights (Erecting Swing Stage) Safe Work Method Statement Includes

Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

 

Instant Document Delivery via Email

FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

 

For work carried out on a regular basis a generic Safe Work Method Statement (SWMS) may be prepared and used for those work activities.

Remember: The content of a Safe Work Method Statement (SWMS) should be refined over time and include consultation with workers and other persons conducting a business or undertaking.

Prior to each new activity, each Safe Work Method Statement (SWMS) must be reviewed and revised to ensure they apply to the current work activities and the actual site you are working at.

Go Digital - Microsoft Word

Edit your SWMS on the go with the Microsoft Office Mobile App

 

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write a Review
$79.95 (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Heights (Erecting Swing Stage) SWMS | Safe Work Method Statement

    This Heights (Erecting Swing Stage) Safe Work Method Statement (SWMS) outlines the general safety steps, general hazards and controls associated with the installation of swing stage scaffold systems. 

    This SWMS includes a Falls Emergency Rescue Plan.

    Job Steps Covered in Heights (Erecting Swing Stage) SWMS:

    (includes potential hazards & control measures)

    1. Planning & Preparation
    2. Suspended Scaffold Design
    3. Training & Capabilities
    4. Implement a Falls Emergency Rescue Plan
    5. Arrival On-site
    6. Materials Delivery
    7. Work Area Set-up
    8. Pre Operational Inspection
    9. Set-up Support/Anchor or Equipment
    10. Electrical Installation (Hoist Operation)
    11. Set-up/Operating Suspended Components
    12. Dismantling Suspended Scaffold
    13. Using Power Tools
    14. On Completion

    Heights (Erecting Swing Stage) Safe Work Method Statement Includes

    Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

     

    Instant Document Delivery via Email

    FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

     

    For work carried out on a regular basis a generic Safe Work Method Statement (SWMS) may be prepared and used for those work activities.

    Remember: The content of a Safe Work Method Statement (SWMS) should be refined over time and include consultation with workers and other persons conducting a business or undertaking.

    Prior to each new activity, each Safe Work Method Statement (SWMS) must be reviewed and revised to ensure they apply to the current work activities and the actual site you are working at.

    Go Digital - Microsoft Word

    Edit your SWMS on the go with the Microsoft Office Mobile App

     

    We're here to help if you need us!

    Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

    SWMS Frequently Asked Questions | Helpful Video Tutorials

  • Document Sample
  • PDF Download
    PDF File
  • Tutorials