Interior Linings (Plasterboard/Gyprock/Fibre Cement) SWMS 10195-8

Product SKU: 10195

Interior Linings (Plasterboard/Gyprock/Fibre Cement) SWMS | Safe Work Method Statement
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Interior Linings (Plasterboard/Gyprock/Fibre Cement) SWMS | Safe Work Method Statement

This Interior Linings (Plasterboard/Gyprock/Fibre Cement) Safe Work Method Statement (SWMS) covers hazards and controls associated with the fixing and setting of plasterboard sheets to walls and ceilings in buildings.

This SWMS also covers the application of cornice.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Silica Dust & Environmental Considerations.

Job Steps Covered in Interior Linings (Plasterboard/Gyprock/Fibre Cement) SWMS:

(includes potential hazards & control measures)

  1. Provide Training & Information to Workers on Respirable Crystalline Silica Dust
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Housekeeping
  6. Manual Tasks
  7. Materials Delivery
  8. Working with Powered & Non-powered Tools
  9. Hazardous Materials/Chemical Use
  10. Working at Height on Ladders, Trestles, Mobile Scaffold & Openings
  11. Cutting Linings
  12. Fixing Linings
  13. Using Stilts
  14. Sanding
  15. On Completion
  16. Emergency Response

Interior Linings (Plasterboard/Gyprock/Fibre Cement) SWMS Includes

Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

 

Instant Document Delivery via Email

FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

Ready to Use Interior Linings (Plasterboard/Gyprock/Fibre Cement) Safe Work Method Statement

Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

Simply add your company details and read the document to ensure all details are relevant to your business.

Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

Interior Linings (Plasterboard/Gyprock/Fibre Cement) Safe Work Method Statements (SWMS) - Microsoft Word Format

Edit your SWMS on the go with the Microsoft Office Mobile App

 

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

2 reviews Write a Review
$79.95   (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Interior Linings (Plasterboard/Gyprock/Fibre Cement) SWMS | Safe Work Method Statement

    This Interior Linings (Plasterboard/Gyprock/Fibre Cement) Safe Work Method Statement (SWMS) covers hazards and controls associated with the fixing and setting of plasterboard sheets to walls and ceilings in buildings.

    This SWMS also covers the application of cornice.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Work in an area that may have a contaminated or flammable atmosphere

    Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Silica Dust & Environmental Considerations.

    Job Steps Covered in Interior Linings (Plasterboard/Gyprock/Fibre Cement) SWMS:

    (includes potential hazards & control measures)

    1. Provide Training & Information to Workers on Respirable Crystalline Silica Dust
    2. Arrival On-site & Assess On-site Conditions
    3. Work Area Set-up
    4. Environment
    5. Housekeeping
    6. Manual Tasks
    7. Materials Delivery
    8. Working with Powered & Non-powered Tools
    9. Hazardous Materials/Chemical Use
    10. Working at Height on Ladders, Trestles, Mobile Scaffold & Openings
    11. Cutting Linings
    12. Fixing Linings
    13. Using Stilts
    14. Sanding
    15. On Completion
    16. Emergency Response

    Interior Linings (Plasterboard/Gyprock/Fibre Cement) SWMS Includes

    Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

     

    Instant Document Delivery via Email

    FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

    Ready to Use Interior Linings (Plasterboard/Gyprock/Fibre Cement) Safe Work Method Statement

    Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

    Simply add your company details and read the document to ensure all details are relevant to your business.

    Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

    Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

    Interior Linings (Plasterboard/Gyprock/Fibre Cement) Safe Work Method Statements (SWMS) - Microsoft Word Format

    Edit your SWMS on the go with the Microsoft Office Mobile App

     

    We're here to help if you need us!

    Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

    SWMS Frequently Asked Questions | Helpful Video Tutorials

  • Document Sample
  • PDF Download
    PDF File
  • Tutorials
  • Reviews
  • 2 Reviews

    • 4

      Quick,Efficient,Serves a purpose

      Posted by Unknown on May 9th 2014

      Easy to access
      Well laid out
      Easy to alter to site specific
      Satisfies the powers to be

    • 4

      Eazy..

      Posted by Unknown on Nov 5th 2013

      Good swms .eazy .

You may also need