Mobile Plant (Chain Trencher) SWMS 10045-7

Product SKU: 10045

Mobile Plant (Chain Trencher) SWMS | Safe Work Method Statement
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Mobile Plant (Chain Trencher) SWMS | Safe Work Method Statement

This Mobile Plant (Chain Trencher) Safe Work Method Statement (SWMS) covers hazards and controls with the view of ensuring that all reasonably practicable steps have been taken to prevent the likelihood of incident during the operation of a chain trencher associated with excavations.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hazardous Manual Tasks, Outdoor Work, Remotely &/or Isolated Work & Environmental Considerations.

Job Steps Covered in Mobile Plant (Chain Trencher) SWMS:

    1. Working Outdoors
    2. Working Alone
    3. Transporting the Trencher
    4. Arrival On-site & Assess On-site Conditions
    5. Work Area Set-up
    6. Environment
    7. Housekeeping
    8. Manual Tasks
    9. Establish a Communication System with Ground Workers
    10. Trencher Operation
    11. Changing Attachments
    12. Refuelling
    13. On Completion
    14. Emergency Response

Mobile Plant (Chain Trencher) SWMS Includes

Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

 

Instant Document Delivery via Email

FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

Ready to Use Mobile Plant (Chain Trencher) Safe Work Method Statement

Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

Simply add your company details and read the document to ensure all details are relevant to your business.

Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

Mobile Plant (Chain Trencher) Safe Work Method Statements (SWMS) - Microsoft Word Format

Edit your SWMS on the go with the Microsoft Office Mobile App

 

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write a Review
$79.95   (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Mobile Plant (Chain Trencher) SWMS | Safe Work Method Statement

    This Mobile Plant (Chain Trencher) Safe Work Method Statement (SWMS) covers hazards and controls with the view of ensuring that all reasonably practicable steps have been taken to prevent the likelihood of incident during the operation of a chain trencher associated with excavations.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Work in an area that may have a contaminated or flammable atmosphere
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

    Additional controls are included for Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hazardous Manual Tasks, Outdoor Work, Remotely &/or Isolated Work & Environmental Considerations.

    Job Steps Covered in Mobile Plant (Chain Trencher) SWMS:

      1. Working Outdoors
      2. Working Alone
      3. Transporting the Trencher
      4. Arrival On-site & Assess On-site Conditions
      5. Work Area Set-up
      6. Environment
      7. Housekeeping
      8. Manual Tasks
      9. Establish a Communication System with Ground Workers
      10. Trencher Operation
      11. Changing Attachments
      12. Refuelling
      13. On Completion
      14. Emergency Response

    Mobile Plant (Chain Trencher) SWMS Includes

    Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

     

    Instant Document Delivery via Email

    FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

    Ready to Use Mobile Plant (Chain Trencher) Safe Work Method Statement

    Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

    Simply add your company details and read the document to ensure all details are relevant to your business.

    Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

    Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

    Mobile Plant (Chain Trencher) Safe Work Method Statements (SWMS) - Microsoft Word Format

    Edit your SWMS on the go with the Microsoft Office Mobile App

     

    We're here to help if you need us!

    Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

    SWMS Frequently Asked Questions | Helpful Video Tutorials

  • Document Sample
  • PDF Download
    PDF File
  • Tutorials

You may also need