SafetyCulture & Scott Cam are urging outdoor workers to prioritise sun protection, offering free products & policy documents. Find out more here.

Electric Fusion

Electric Fusion - Poly Pipe Butt Welding (PPW) Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Electric Fusion - Poly Pipe Butt Welding (PPW) Safe Work Method Statement

This Electric Fusion - Poly Pipe Butt Welding (PPW) Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with polyethylene pipe welding (PPW) - Butt.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Electric Fusion - Poly Pipe Butt Welding (PPW) SWMS:

(includes potential hazards and control measures)

  1. Arrival On-site and Assess Onsite Conditions
  2. Check Weather Conditions and Prepare
  3. Environment
  4. Work Area Set-up
  5. Working Near Powered Mobile Plant
  6. House Keeping
  7. Manual Tasks
  8. Electric and Polyethylene Pipe Welding (PPW)
  9. Conduct Visual Inspection of Weld
  10. On Completion
  11. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Electric Fusion - Poly Pipe Butt Welding (PPW) Safe Work Method Statement

This Electric Fusion - Poly Pipe Butt Welding (PPW) Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with polyethylene pipe welding (PPW) - Butt.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Electric Fusion - Poly Pipe Butt Welding (PPW) SWMS:

(includes potential hazards and control measures)

  1. Arrival On-site and Assess Onsite Conditions
  2. Check Weather Conditions and Prepare
  3. Environment
  4. Work Area Set-up
  5. Working Near Powered Mobile Plant
  6. House Keeping
  7. Manual Tasks
  8. Electric and Polyethylene Pipe Welding (PPW)
  9. Conduct Visual Inspection of Weld
  10. On Completion
  11. Emergency Response
PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View