Power Pole (Removal/Installation) SWMS 10328-4

Product SKU: 10328

Power Pole (Removal/Installation) SWMS | Safe Work Method Statement
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Power Pole (Removal/Installation) SWMS | Safe Work Method Statement

This Power Pole (Removal/Installation) SWMS covers general hazards associated with power pole removal and installation using a lifter/borer in the presence of overhead power lines and in close proximity to roads with public vehicular traffic.

This SWMS includes controls for working adjacent to powerlines, traffic control, planning, preparation and safe work with mobile plant.

This SWMS includes a Lifter/Borer Pre-start Checklist.

Job Steps Covered in Power Pole (Removal/Installation) SWMS:

(includes potential hazards & control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Assess On-site Conditions
  4. Site Set-up
  5. Select & Inspect Equipment
  6. Pre-Operational Assessment
  7. Lifter/Borer Operation
  8. Auger Use (Excavating Post Hole)
  9. Backfill Holes
  10. Maintenance On-Site
  11. On Completion

Power Pole (Removal/Installation) Safe Work Method Statement Includes

Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

 

Instant Document Delivery via Email

FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

 

Ready to Use

Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

Simply add your company details and read the document to ensure all details are relevant to your business.

Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

Go Digital - Microsoft Word

Edit your SWMS on the go with the Microsoft Office Mobile App

 

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write a Review
$79.95 (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Power Pole (Removal/Installation) SWMS | Safe Work Method Statement

    This Power Pole (Removal/Installation) SWMS covers general hazards associated with power pole removal and installation using a lifter/borer in the presence of overhead power lines and in close proximity to roads with public vehicular traffic.

    This SWMS includes controls for working adjacent to powerlines, traffic control, planning, preparation and safe work with mobile plant.

    This SWMS includes a Lifter/Borer Pre-start Checklist.

    Job Steps Covered in Power Pole (Removal/Installation) SWMS:

    (includes potential hazards & control measures)

    1. Planning & Preparation
    2. Training & Capabilities
    3. Assess On-site Conditions
    4. Site Set-up
    5. Select & Inspect Equipment
    6. Pre-Operational Assessment
    7. Lifter/Borer Operation
    8. Auger Use (Excavating Post Hole)
    9. Backfill Holes
    10. Maintenance On-Site
    11. On Completion

    Power Pole (Removal/Installation) Safe Work Method Statement Includes

    Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

     

    Instant Document Delivery via Email

    FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

     

    Ready to Use

    Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

    Simply add your company details and read the document to ensure all details are relevant to your business.

    Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

    Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

    Go Digital - Microsoft Word

    Edit your SWMS on the go with the Microsoft Office Mobile App

     

    We're here to help if you need us!

    Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

    SWMS Frequently Asked Questions | Helpful Video Tutorials

  • Document Sample
  • PDF Download
    PDF File
  • Tutorials

You may also need