Roadworks (Asphalt/Concrete) Application/Repairs SWMS 10013-7

Product SKU: 10013

Roadworks (Asphalt/Concrete) Application/Repairs SWMS | Safe Work Method Statement
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Roadworks (Asphalt/Concrete) Application/Repairs SWMS | Safe Work Method Statement

This Roadworks (Asphalt/Concrete) Application/Repairs Safe Work Method Statement (SWMS) covers hazards and controls associated with minor asphalt repairs and application.

This SWMS includes setting up safe work zone for short term works in a traffic corridor, the application of hot bitumen/asphalt mix (between 140-200 degrees Celsius) and concrete to roads.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Job Steps Covered in Roadworks (Asphalt/Concrete) Application/Repairs SWMS:

(includes potential hazards & control measures)

  1. Training
  2. Planning
  3. Working Outdoors  
  4. Arrival On-site & Assess On-site Conditions
  5. Establish Safe Work Zone (site set-up)
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Working with Powered & Non-powered Tools
  10. Working Adjacent to Traffic
  11. Air Compressor Operation
  12. Hazardous Substance/Chemical Use
  13. Working Adjacent to Powered Mobile Plant
  14. Cutting Damaged Sections of Road Surface
  15. Asphalt or Concrete Application
  16. Fuelling On-site
  17. On Completion
  18. Emergency Response

Roadworks (Asphalt/Concrete) Application/Repairs SWMS Includes

Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

 

Instant Document Delivery via Email

FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

Ready to Use Roadworks (Asphalt/Concrete) Application/Repairs Safe Work Method Statement

Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

Simply add your company details and read the document to ensure all details are relevant to your business.

Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

Roadworks (Asphalt/Concrete) Application/Repairs Safe Work Method Statements (SWMS) - Microsoft Word Format

Edit your SWMS on the go with the Microsoft Office Mobile App

 

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write a Review
$79.95   (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Roadworks (Asphalt/Concrete) Application/Repairs SWMS | Safe Work Method Statement

    This Roadworks (Asphalt/Concrete) Application/Repairs Safe Work Method Statement (SWMS) covers hazards and controls associated with minor asphalt repairs and application.

    This SWMS includes setting up safe work zone for short term works in a traffic corridor, the application of hot bitumen/asphalt mix (between 140-200 degrees Celsius) and concrete to roads.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Work in an area that may have a contaminated or flammable atmosphere
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

    Additional controls are included for Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

    Job Steps Covered in Roadworks (Asphalt/Concrete) Application/Repairs SWMS:

    (includes potential hazards & control measures)

    1. Training
    2. Planning
    3. Working Outdoors  
    4. Arrival On-site & Assess On-site Conditions
    5. Establish Safe Work Zone (site set-up)
    6. Environment
    7. Housekeeping
    8. Manual Tasks
    9. Working with Powered & Non-powered Tools
    10. Working Adjacent to Traffic
    11. Air Compressor Operation
    12. Hazardous Substance/Chemical Use
    13. Working Adjacent to Powered Mobile Plant
    14. Cutting Damaged Sections of Road Surface
    15. Asphalt or Concrete Application
    16. Fuelling On-site
    17. On Completion
    18. Emergency Response

    Roadworks (Asphalt/Concrete) Application/Repairs SWMS Includes

    Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

     

    Instant Document Delivery via Email

    FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

    Ready to Use Roadworks (Asphalt/Concrete) Application/Repairs Safe Work Method Statement

    Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

    Simply add your company details and read the document to ensure all details are relevant to your business.

    Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

    Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

    Roadworks (Asphalt/Concrete) Application/Repairs Safe Work Method Statements (SWMS) - Microsoft Word Format

    Edit your SWMS on the go with the Microsoft Office Mobile App

     

    We're here to help if you need us!

    Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

    SWMS Frequently Asked Questions | Helpful Video Tutorials

  • Document Sample
  • PDF Download
    PDF File
  • Tutorials

You may also need