Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

Roofing sheet metal removal job in progress.

Roofing Removal Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Roofing Removal Safe Work Method Statement

This Roofing Removal Safe Work Method Statement (SWMS) covers hazards and controls associated with the removal of roofing materials e.g. tiles, metal sheeting from a roof.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Asbestos disturbance
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Roofing Removal SWMS:

(includes potential hazards & control measures)

  1. Implement a Falls Emergency Rescue Plan
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Working Outdoors
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Accessing the Roof using Mobile Scaffolding or Extension Ladder
  9. Roof Removal
  10. Working with Powered & Non-powered Tools
  11. Hazardous Chemical Use (e.g. silicone, cleaning solutions)
  12. On Completion
  13. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Roofing Removal Safe Work Method Statement

This Roofing Removal Safe Work Method Statement (SWMS) covers hazards and controls associated with the removal of roofing materials e.g. tiles, metal sheeting from a roof.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Asbestos disturbance
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Roofing Removal SWMS:

(includes potential hazards & control measures)

  1. Implement a Falls Emergency Rescue Plan
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Working Outdoors
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Accessing the Roof using Mobile Scaffolding or Extension Ladder
  9. Roof Removal
  10. Working with Powered & Non-powered Tools
  11. Hazardous Chemical Use (e.g. silicone, cleaning solutions)
  12. On Completion
  13. Emergency Response
PDF Download
PDF File

Hear From Our Customers

  • 5

    A-Z of everything we need

    A-Z of everything we need, more than helpful customer service and all questions answered.
    1st class company!

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View