Roofing (Sheeting) SWMS 10224-6

Product SKU: 10224

Roofing (Sheeting) SWMS | Safe Work Method Statement
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Roofing (Sheeting) SWMS | Safe Work Method Statement

This Roofing (Sheeting) Safe Work Method Statement (SWMS) covers hazards and controls associated with the installation of a corrugated iron roof, use and subsequent dismantling of roof edge protection systems.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Asbestos disturbance
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

Bonus Working at Height Risk Asessment Checklist included with this SWMS.

Job Steps Covered in Roofing (Sheeting) SWMS:

(includes potential hazards & control measures)

  1. Implement a Falls Emergency Rescue Plan
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Working Outdoors
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Fixing Edge Protection (following manufacturers’ instructions)
  9. Install Sheeting (following manufacturers’ instructions)
  10. Hand & Power Tool Use
  11. Hazardous Chemical Use (e.g. silicone, cleaning solutions)
  12. Dismantling Edge Protection
  13. On Completion
  14. Emergency Response

Roofing (Sheeting) SWMS Includes

Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

 

Instant Document Delivery via Email

FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

Ready to Use Roofing (Sheeting) Safe Work Method Statement

Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

Simply add your company details and read the document to ensure all details are relevant to your business.

Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

Roofing (Sheeting) Safe Work Method Statements (SWMS) - Microsoft Word Format

Edit your SWMS on the go with the Microsoft Office Mobile App

 

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: [email protected]

SWMS Frequently Asked Questions | Helpful Video Tutorials

1 review Write a Review
$79.95   (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Roofing (Sheeting) SWMS | Safe Work Method Statement

    This Roofing (Sheeting) Safe Work Method Statement (SWMS) covers hazards and controls associated with the installation of a corrugated iron roof, use and subsequent dismantling of roof edge protection systems.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Asbestos disturbance
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

    Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work & Environmental Considerations.

    Bonus Working at Height Risk Asessment Checklist included with this SWMS.

    Job Steps Covered in Roofing (Sheeting) SWMS:

    (includes potential hazards & control measures)

    1. Implement a Falls Emergency Rescue Plan
    2. Arrival On-site & Assess On-site Conditions
    3. Work Area Set-up
    4. Working Outdoors
    5. Environment
    6. Housekeeping
    7. Manual Tasks
    8. Fixing Edge Protection (following manufacturers’ instructions)
    9. Install Sheeting (following manufacturers’ instructions)
    10. Hand & Power Tool Use
    11. Hazardous Chemical Use (e.g. silicone, cleaning solutions)
    12. Dismantling Edge Protection
    13. On Completion
    14. Emergency Response

    Roofing (Sheeting) SWMS Includes

    Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

     

    Instant Document Delivery via Email

    FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

    Ready to Use Roofing (Sheeting) Safe Work Method Statement

    Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

    Simply add your company details and read the document to ensure all details are relevant to your business.

    Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

    Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

    Roofing (Sheeting) Safe Work Method Statements (SWMS) - Microsoft Word Format

    Edit your SWMS on the go with the Microsoft Office Mobile App

     

    We're here to help if you need us!

    Call 1300 306 604 9am to 5pm, Monday to Friday | Email: [email protected]

    SWMS Frequently Asked Questions | Helpful Video Tutorials

  • Document Sample
  • PDF Download
    PDF File
  • Tutorials
  • Reviews
  • 1 Review

    • 4

      Worked great

      Posted by Cathrina Hutton on Feb 11th 2016

      The SWMS purchased did the job well. It was filled out easily and the staff understood it.
      The site manager where it was used accepted it and said it was one of the best he had seen.

You may also need