Steel Liner Installation SWMS 10603-1

Product SKU: 10603

Steel Liner Installation SWMS | Safe Work Method Statement
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Steel Liner Installation SWMS | Safe Work Method Statement

This Steel Liner Installation Safe Work Method Statement (SWMS) covers hazards and controls when installing a steel liner.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor work & Environmental Considerations.

Job Steps Covered in Steel Liner Installation SWMS:

(includes potential hazards & control measures).

  1. Planning
  2. Arrival On-site & Assess On-site Conditions
  3. Working Outdoors
  4. Delivery & Removal of the Plant
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Connecting Attachments/Augers
  10. Bored Pier, Screw & Unscrewing the Liner, Drilling Out Spoil from Inside Liner
  11. Placement & Removal of the Steel Liner using a Crane
  12. Steel & concrete Placement
  13. Plant Maintenance On-site
  14. On Completion
  15. Emergency Response

Steel Liner Installation Safe Work Method Statement Includes

Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

 

Instant Document Delivery via Email

FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

 

Ready to Use

Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

Simply add your company details and read the document to ensure all details are relevant to your business.

Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

Go Digital - Microsoft Word

Edit your SWMS on the go with the Microsoft Office Mobile App

 

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write a Review
$79.95 (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Steel Liner Installation SWMS | Safe Work Method Statement

    This Steel Liner Installation Safe Work Method Statement (SWMS) covers hazards and controls when installing a steel liner.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

    Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor work & Environmental Considerations.

    Job Steps Covered in Steel Liner Installation SWMS:

    (includes potential hazards & control measures).

    1. Planning
    2. Arrival On-site & Assess On-site Conditions
    3. Working Outdoors
    4. Delivery & Removal of the Plant
    5. Work Area Set-up
    6. Environment
    7. Housekeeping
    8. Manual Tasks
    9. Connecting Attachments/Augers
    10. Bored Pier, Screw & Unscrewing the Liner, Drilling Out Spoil from Inside Liner
    11. Placement & Removal of the Steel Liner using a Crane
    12. Steel & concrete Placement
    13. Plant Maintenance On-site
    14. On Completion
    15. Emergency Response

    Steel Liner Installation Safe Work Method Statement Includes

    Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

     

    Instant Document Delivery via Email

    FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

     

    Ready to Use

    Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

    Simply add your company details and read the document to ensure all details are relevant to your business.

    Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

    Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

    Go Digital - Microsoft Word

    Edit your SWMS on the go with the Microsoft Office Mobile App

     

    We're here to help if you need us!

    Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

    SWMS Frequently Asked Questions | Helpful Video Tutorials

  • Document Sample
  • PDF Download
    PDF File
  • Tutorials