Tiling SWMS 10267-8

Product SKU: 10267

Tiling SWMS | Safe Work Method Statement
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Tiling SWMS | Safe Work Method Statement

This Tiling Safe Work Method Statement (SWMS) covers hazards and risk controls when tiling walls, floors and swimming pools.

Suitable for any type of tiling the SWMS provides controls for setting up the work area, environmental hazards, manual handling, mixing and laying compounds and the cutting and laying of tiles.

Additional controls for High-Risk Construction Work including working near powered mobile plant, falls and contaminated atmospheres.

Job Steps Covered in Tiling SWMS:

(includes potential hazards & control measures)

  1. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
  2. Working Outdoors
  3. Arrival On-site & Assess On-site Conditions
  4. Work Area Set-up
  5. Environment
  6. House-keeping
  7. Manual Tasks
  8. Materials Delivery
  9. Working with Powered & Non-powered Tools
  10. Mixing & Working with Levelling Compounds, Cement, Glues, Grout etc.
  11. Working at Height on Ladders, Trestles, Mobile Scaffold
  12. Cutting & Laying Tiles
  13. On Completion
  14. Emergency Response

Tiling Safe Work Method Statement Includes

Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

 

Instant Document Delivery via Email

FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

 

Ready to Use

Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

Simply add your company details and read the document to ensure all details are relevant to your business.

Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

Go Digital - Microsoft Word

Edit your SWMS on the go with the Microsoft Office Mobile App

 

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

1 review Write a Review
$79.95 (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Tiling SWMS | Safe Work Method Statement

    This Tiling Safe Work Method Statement (SWMS) covers hazards and risk controls when tiling walls, floors and swimming pools.

    Suitable for any type of tiling the SWMS provides controls for setting up the work area, environmental hazards, manual handling, mixing and laying compounds and the cutting and laying of tiles.

    Additional controls for High-Risk Construction Work including working near powered mobile plant, falls and contaminated atmospheres.

    Job Steps Covered in Tiling SWMS:

    (includes potential hazards & control measures)

    1. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
    2. Working Outdoors
    3. Arrival On-site & Assess On-site Conditions
    4. Work Area Set-up
    5. Environment
    6. House-keeping
    7. Manual Tasks
    8. Materials Delivery
    9. Working with Powered & Non-powered Tools
    10. Mixing & Working with Levelling Compounds, Cement, Glues, Grout etc.
    11. Working at Height on Ladders, Trestles, Mobile Scaffold
    12. Cutting & Laying Tiles
    13. On Completion
    14. Emergency Response

    Tiling Safe Work Method Statement Includes

    Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

     

    Instant Document Delivery via Email

    FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

     

    Ready to Use

    Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

    Simply add your company details and read the document to ensure all details are relevant to your business.

    Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

    Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

    Go Digital - Microsoft Word

    Edit your SWMS on the go with the Microsoft Office Mobile App

     

    We're here to help if you need us!

    Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

    SWMS Frequently Asked Questions | Helpful Video Tutorials

  • Document Sample
  • PDF Download
    PDF File
  • Tutorials
  • Reviews
  • 1 Review

    • 5

      Everything you need

      Posted by Unknown on Jul 1st 2016

      Basically, everything you need in a SWMS made specifically for Tiling works.
      Thanks

You may also need