Traffic Line Removal SWMS 10456-3

Product SKU: 10456

Traffic Line Removal SWMS | Safe Work Method Statement
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Traffic Line Removal SWMS | Safe Work Method Statement

This Traffic Line Removal Safe Work Method Statement (SWMS) covers hazards and controls associated with the removal of traffic line markings.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hazardous Manual Tasks, Outdoor Work, Remotely &/or Isolated Work, Silica Dust & Environmental Considerations.

Job Steps Covered in Traffic Line Removal SWMS:

(includes potential hazards & control measures)

  1. Working Outdoors
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Housekeeping
  6. Manual Tasks
  7. Working Near Overhead Electric Lines
  8. Delivery, Set-up & Removal of the Machine
  9. Establish a Communication System with Ground Workers
  10. Grinding the Lines
  11. Working Outside the Cabin near the Powered Mobile Plant
  12. Changing Attachments
  13. Operations with Hydraulic Attachments
  14. Fuelling the Plant
  15. On Completion
  16. Emergency Response

Traffic Line Removal SWMS Includes

Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

 

Instant Document Delivery via Email

FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

Ready to Use Traffic Line Removal Safe Work Method Statement

Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

Simply add your company details and read the document to ensure all details are relevant to your business.

Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

Traffic Line Removal Safe Work Method Statements (SWMS) - Microsoft Word Format

Edit your SWMS on the go with the Microsoft Office Mobile App

 

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: [email protected]

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write a Review
$79.95   (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Traffic Line Removal SWMS | Safe Work Method Statement

    This Traffic Line Removal Safe Work Method Statement (SWMS) covers hazards and controls associated with the removal of traffic line markings.

    This SWMS covers High-Risk Construction Work (HRCW) controls related to:

    • Mobile plant movement
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Work in an area that may have a contaminated or flammable atmosphere
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

    Additional controls are included for Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hazardous Manual Tasks, Outdoor Work, Remotely &/or Isolated Work, Silica Dust & Environmental Considerations.

    Job Steps Covered in Traffic Line Removal SWMS:

    (includes potential hazards & control measures)

    1. Working Outdoors
    2. Arrival On-site & Assess On-site Conditions
    3. Work Area Set-up
    4. Environment
    5. Housekeeping
    6. Manual Tasks
    7. Working Near Overhead Electric Lines
    8. Delivery, Set-up & Removal of the Machine
    9. Establish a Communication System with Ground Workers
    10. Grinding the Lines
    11. Working Outside the Cabin near the Powered Mobile Plant
    12. Changing Attachments
    13. Operations with Hydraulic Attachments
    14. Fuelling the Plant
    15. On Completion
    16. Emergency Response

    Traffic Line Removal SWMS Includes

    Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

     

    Instant Document Delivery via Email

    FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

    Ready to Use Traffic Line Removal Safe Work Method Statement

    Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

    Simply add your company details and read the document to ensure all details are relevant to your business.

    Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

    Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

    Traffic Line Removal Safe Work Method Statements (SWMS) - Microsoft Word Format

    Edit your SWMS on the go with the Microsoft Office Mobile App

     

    We're here to help if you need us!

    Call 1300 306 604 9am to 5pm, Monday to Friday | Email: [email protected]

    SWMS Frequently Asked Questions | Helpful Video Tutorials

  • Document Sample
  • PDF Download
    PDF File
  • Tutorials

You may also need