Waterproofing (Wet Areas - Roofs/Balconies) SWMS 10294-8

Product SKU: 10294

Waterproofing (Wet Areas - Roofs/Balconies) SWMS | Safe Work Method Statement
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Edit documents on the go with Microsoft Office Mobile App
    • Only pay once (no subscriptions required).

Waterproofing (Wet Areas - Roofs/Balconies) SWMS | Safe Work Method Statement

This Waterproofing (Wet Areas - Roofs/Balconies) Safe Work Method Statement (SWMS) outlines the safety steps, general hazards and controls associated with the preparation and laying of waterproofing internal wet areas, balconies and rooftops.

Additional controls for High-Risk Construction Work including falling from 2 metres or more and contaminated atmospheres.

If the rooftop does not have an edge barrier (able to support the weight of a person in motion) with a minimum height of 900mm, you will require a ‘working on Roofs SWMS’ that details how the risk of a fall will be reduced or removed.

Job Steps Covered in Waterproofing (Wet Areas - Roofs/Balconies) SWMS:

(includes potential hazards & control measures)

  1. Arrival On-site & Assess On-site Conditions
  2. Work Area Set-up
  3. Environment
  4. House-keeping
  5. Manual Tasks
  6. Working with Powered & Non-powered Tools
  7. Working on Balconies & Rooftops
  8. Mixing Waterproofing Compounds
  9. Applying Membrane
  10. Torch-on Sheet Membranes
  11. On Completion
  12. Emergency Response

Waterproofing (Wet Areas - Roofs/Balconies) Safe Work Method Statement Includes

Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

 

Instant Document Delivery via Email

FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

 

Ready to Use

Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

Simply add your company details and read the document to ensure all details are relevant to your business.

Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

Go Digital - Microsoft Word

Edit your SWMS on the go with the Microsoft Office Mobile App

 

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

1 review Write a Review
$79.95 (Ex. GST)

Need help?

Call us on 1300 306 604, send us a message via live chat or click the link below.

Contact us
-
  • Description
    • Instant Document Delivery via Email.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Customisation instructions provided.
      • Complies with Australian & New Zealand legislation.
      • Edit documents on the go with Microsoft Office Mobile App
      • Only pay once (no subscriptions required).

    Waterproofing (Wet Areas - Roofs/Balconies) SWMS | Safe Work Method Statement

    This Waterproofing (Wet Areas - Roofs/Balconies) Safe Work Method Statement (SWMS) outlines the safety steps, general hazards and controls associated with the preparation and laying of waterproofing internal wet areas, balconies and rooftops.

    Additional controls for High-Risk Construction Work including falling from 2 metres or more and contaminated atmospheres.

    If the rooftop does not have an edge barrier (able to support the weight of a person in motion) with a minimum height of 900mm, you will require a ‘working on Roofs SWMS’ that details how the risk of a fall will be reduced or removed.

    Job Steps Covered in Waterproofing (Wet Areas - Roofs/Balconies) SWMS:

    (includes potential hazards & control measures)

    1. Arrival On-site & Assess On-site Conditions
    2. Work Area Set-up
    3. Environment
    4. House-keeping
    5. Manual Tasks
    6. Working with Powered & Non-powered Tools
    7. Working on Balconies & Rooftops
    8. Mixing Waterproofing Compounds
    9. Applying Membrane
    10. Torch-on Sheet Membranes
    11. On Completion
    12. Emergency Response

    Waterproofing (Wet Areas - Roofs/Balconies) Safe Work Method Statement Includes

    Risk Assessment Matrix | Hierarchy of Controls | PPE Requirements | Emergency Response

     

    Instant Document Delivery via Email

    FREE Current OHS Legislation & Codes of Practice Reference List (Value $9.95)

     

    Ready to Use

    Save time with our content-rich, fully editable Safe Work Method Statements (SWMS).

    Simply add your company details and read the document to ensure all details are relevant to your business.

    Check for any additional hazards not already covered and make amendments to your SWMS as necessary.

    Your Safe Work Method Statement (SWMS) is then ready for use and as a point of reference at OHS Toolbox Talk meetings.

    Go Digital - Microsoft Word

    Edit your SWMS on the go with the Microsoft Office Mobile App

     

    We're here to help if you need us!

    Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

    SWMS Frequently Asked Questions | Helpful Video Tutorials

  • Document Sample
  • PDF Download
    PDF File
  • Tutorials
  • Reviews
  • 1 Review

    • 4

      Informative and helps with planing

      Posted by Michael Collins on Feb 14th 2013

      There was some confusion as to what a SWMS was. Some are of the opinion that it is a risk assessment with no mention as to the work stages or procedures. This document cleared the confusion

You may also need